Clients follow every product through production.
In the film
- 3D product journeys Rotate, zoom and explore up to 25 production stages.
- Fully offline No internet, and no data leaves the site.
- Hotspots Tap any component for parts, tools and cycle time.
- Innovation decks Live project status and an offline deck viewer.
- The result Clients follow every product through production.
Summary
Tata Electronics opened a visitor experience center at its facility in Hosur, Tamil Nadu. We built a 55-inch interactive 3D touchscreen coffee table that shows each product's journey across up to 25 production stages, live project status and the latest innovation decks. It runs fully offline to meet strict IP and NDA requirements, and was handed over within six weeks of project approval.
The brief
The client
Tata Electronics Private Limited was established in 2020 as a greenfield venture of the Tata Group. It works across four business lines: Electronics Manufacturing Services (EMS), Semiconductor Assembly and Test, Semiconductor Foundry, and Design Services. It has strategic alliances with Qualcomm, Intel, ROHM and Merck Electronics.

The challenge
Showing semiconductor and electronics work to visiting clients is hard. Products are intricate, multi-stage assemblies, and the process is full of intellectual property. Visitors such as OEM partners, government delegations and investors need to understand the company's capability without walking across a live production floor. Photographs, static decks and video walls could not offer the interactivity needed.
Tata Electronics set four requirements:
- Show complete product journeys, from raw component to final assembly, across several product lines in one interactive 3D interface.
- Show live project status for active engagements during client visits.
- Display the latest innovation decks and R&D updates without relying on a presenter's laptop.
- Run fully offline and on-premise, with no internet dependency, to meet strict IP protection and NDA requirements.
What we built
We designed and deployed a custom interactive 3D touchscreen platform on a 55-inch touchscreen coffee table. It runs on a local, Windows-based system with no cloud sync, no external API calls and no internet access. All 3D models, annotations, product images and dashboards stay on Tata's internal network. The home screen has three modules, each one tap away.
3D product journeys across 25 production stages
Visitors explore the product range as interactive 3D models. Each product is mapped across up to 25 production stages, from first component to final assembly. At every stage the screen shows:
- A 3D model visitors can rotate and zoom with pinch-and-pan gestures
- Clickable hotspots on key components
- An info panel with part details, tools used, cycle time and critical quality checkpoints
- Real photographs from that production stage
Live project status dashboard
A dashboard designed to connect to Tata Electronics' internal project management systems shows visual summaries, timelines and status indicators for ongoing engagements. Client meetings can use live project information instead of slides, and no data leaves the site.
Offline innovation deck viewer
The team loads the latest PowerPoint and PDF decks straight onto the touchscreen. They display in full quality, are navigated by touch, and never depend on a guest network.
A simple admin CMS
Behind the three modules is an admin CMS that needs little technical knowledge. Tata's team can add, edit or delete categories, products, stages, 3D files and annotations themselves, and changes sync to the screen automatically, all within the local system.
Why it runs offline
For a company working in semiconductor design and electronics manufacturing, a cloud-based showcase was not an option. The set-up gives:
- No external dependencies: no internet, no cloud and no third-party API calls.
- Full IP residency: all assets stay on Tata's own hardware and network.
- NDA-grade confidentiality, built in from day one.
- Client ownership: the full intellectual property of the deployed solution belongs to Tata Electronics.
How it was delivered
To meet a time-sensitive client demonstration in August, we delivered in two phases.
- Phase 1: a branded 32-inch touch panel with content-loading software, so Tata Electronics could show videos, PDFs and image decks to early client visitors straight away.
- Phase 2: the full 55-inch interactive 3D touchscreen coffee table and custom platform, built, tested and handed over within six weeks of project approval, including on-site installation, configuration and CMS training for Tata's team.
Results
Tata Electronics now has a visitor experience center where clients can follow products through production, see live project status and review innovation decks, without visiting the production floor and without any data leaving the site. The internal team manages all content itself, and the full system was in place within six weeks of approval.
Client: Tata Electronics
Other client work

Spark Minda
Nine Dojo principles, nine experiences: a one-day Digital Dojo workshop with an AR engine and VR safety zones. Learning by doing, not by slides.
Read the case study
Tata AutoComp
VR training for sheet metal operators across six plants
Read the case study
TAFE
An AR-powered tractor experience center: 19 tractors and implements life-size in AR, and a 4D welcome.
Read the case studySolutions used in this project: 3D product configurators.


